Features
Thermodynamic equipment
Thermal control
Plate heat exchanger
Fluid system (circulation unit, expansion tank, buffer tank…)
Measurements (thermal and electrical meters, temperature, HP and LP manometer)
Training activities:
Hydraulic and electricalwiring and connecting
Commissioning, configurationand maintenance
Overall and subsystem thermal balance
Techno-economic and environmental analyses
Dimensioning the installation
Key points:
Real heat pump
50L buffer tank to avoid short-cycle
Software for datalogging (with option PC21 or PC22)
References:
PC55: Instrumented 5kW Water/Water heat pump with external exchanger
PC51: 3-way valve for Domestic Hot Water production (tank with exchanger not included)
PC52: Drilling pump and 1000L tank
PC21: Data logging and teleprocessing station
PC22: 4-channel temperature recorder and data logger with thermocouple probes
PC23: Tube-in-shell exchanger (Optional)
PC25:15kW hot water air heater